Forest management and harvest planning in Nelson, Tasman and Marlborough
Woodlot and forest management from harvest plan to close-out, with NES-CF compliance built in and our own earthworks team on the roads.
Forest management for woodlots and commercial forests
Aspect Contracting and Forestry manages woodlots and commercial forests across Nelson, Tasman and Marlborough, from harvest planning and NES-CF compliance to supervision and replanting. Mitch brings more than a decade of harvest supervision and forest engineering to your block, and our earthworks team builds the roads and skids, so the plan and the earthworks come from one business.
Forest management work we take on
Farm foresters and woodlot owners nearing harvest age, often facing a first harvest.
Forest managers who want a local contractor to help run the operation.
Owners of wind-damaged blocks who need a salvage plan.
Owners unsure what the rules require. Too much red tape, not sure where to start? Talk to Mitch.
Related services: Forest harvesting and woodlots · Forestry roading and skid sites · Land preparation and replanting
From harvest plan to close-out
1
Walk the block
Mitch checks the erosion susceptibility zone, slope, streams, access and neighbours, and tells you what is permitted and what needs consent.
2
Plan and design
Harvest boundary, road lines, landings, harvest system and setbacks mapped, with a slash mobilisation risk assessment where required.
3
Notices and plans
We confirm what each council needs and agree who prepares and lodges the notices and management plans.
4
Build and supervise
Our earthworks team builds the roads and skids; Mitch supervises the harvesting subcontractors, log quality and environmental controls.
5
Close out
Slash tidied, cutover stabilised, and the replanting or land-use decision made.
Rules for forest management
The National Environmental Standards for Commercial Forestry (NES-CF) apply to any plantation forest of 1 ha or more grown to be harvested (MPI). Harvest plans include a slash mobilisation risk assessment (Beehive).
A high slash mobilisation risk on orange zone land makes the harvest a controlled activity needing consent (MPI).
Harvest notice must reach the council 20 to 60 working days before you start, or 2 days for salvage (NES-CF Regulations 2017).
Rules and thresholds change; we confirm the current position with your council before we quote.
Forestry experience behind the plan
Mitch authored Forest Growers Research report PSP-T032 on mechanised steep-slope planting, February 2025 (FGR). Aspect is SafeTree and Tōtika certified, holds a Forest Growers Research award, 2024, and a PF Olsen award, 2023, and was a 2026 Top of the South Forestry Awards nominee (Roading Excellence and Innovation).
Forestry earthworks for wind-damage salvage, Tasman. Aspect built the extraction tracks and roads, upgraded and drained the existing roads, installed the culverts and supplied the aggregate so harvest crews could salvage wind-damaged timber before it lost value. These figures describe that project, not a standard specification or timeframe.
20,000+ lm
Extraction tracks and roads
15,000+ lm
Road upgrade and drainage
100+
Culverts
5,000+ t
Aggregate supplied
Forest management FAQs
Common questions from woodlot owners and forest managers. Still unsure? Call Mitch on 021 502 429.
What does a forest manager do for a small woodlot owner?
A forest manager plans the harvest, handles council notices and management plans, engages and supervises the crew, manages log quality and closes out the site. WorkSafe's small-forest guidance says the owner must appoint a competent manager or do these tasks personally (WorkSafe). We agree which tasks we take on and keep you informed.
How much does forest management cost in Nelson and Tasman?
The fee depends on block size, terrain and access, the harvest system, how much roading is needed and how many log grades you cut. We look after everything from a single woodlot to several blocks. A phone call gives you a ballpark; a site walk gives you a fixed quote.
Do I have to tell the council before I harvest my trees?
Yes. Written notice must reach the council 20 to 60 working days before harvesting starts, or 2 days for salvage, with a harvest plan in place 20 working days beforehand (NES-CF Regulations 2017). Tasman District Council asks for the plan within five working days (MPI Ground Rules). We agree who lodges them.
Should I register my forest in the ETS as standard or permanent forestry?
Standard forestry uses averaging: you harvest and replant without surrendering units, but only earn units until the first rotation reaches average age. Permanent forestry limits harvesting, penalises crown cover of 30% or less and locks you in for 50 years (MPI). Get specialist ETS advice before registering.
What is a carbon unit (NZU) worth?
NZU prices move daily and can change sharply within a year, so we never plan on one number. Live spot prices are published by emsTradepoint (emsTradepoint) and PF Olsen (PF Olsen). We look at harvest and replanting decisions across a range of prices and talk you through what changes.
How long does harvest planning take before the first tree comes down?
Allow at least three months. The council notice must be lodged 20 to 60 working days before harvest and the harvest plan completed 20 working days before (NES-CF Regulations 2017). Salvage moves much faster. Call early and we will tell you honestly when we can start.
Can you manage a woodlot in Golden Bay or the Marlborough Sounds?
Yes. From Wakefield we manage blocks across Nelson, Tasman, Golden Bay and Marlborough, including the Sounds, St Arnaud and Murchison. Marlborough woodlots sit under the Marlborough Environment Plan as well as the NES-CF, with river and coastal setbacks we build into every plan (Marlborough District Council).
What clients say
Request a quote
Tell us where the block is and how old the trees are. We work across Nelson, Tasman and Marlborough, including Golden Bay/Tākaka, St Arnaud, Murchison, Blenheim, Picton and the Marlborough Sounds.
Call Mitch: 021 502 429
Email: info@aspecthub.co.nz
Aspect Contracting and Forestry, 65 Whitby Road, Wakefield
Emergency enquiries: call Mitch at any time; routine enquiries answered within 48 hours.








