Skip to main content

Too much red tape, not sure where to start? Call Mitch directly at 021502429, let's make it happen together!

Dam, earthworks and forestry contractors in Marlborough

Irrigation dams, fire ponds, vineyard and rural earthworks, tracks, river repair and forestry from the Wairau Valley to Picton and the Sounds, from our Wakefield yard.

Built for Marlborough's vineyards, dams and rural blocks

Aspect Contracting and Forestry is a civil earthworks and forestry contractor based in Wakefield, about 90 minutes from the Wairau Valley. In Marlborough we build irrigation dams and fire ponds, vineyard and rural earthworks, tracks, culverts and river bank repair, and carry out forestry roading and manage subcontracted harvesting crews. Work here is usually planned as larger packages, but we take a look at anything.

Services most in demand in Marlborough

What's happening in Marlborough

Marlborough is a land-use story more than a housing story. The region had 49,431 people at the 2023 Census, up 4.4 percent (Stats NZ), and the 2025 housing assessment found Blenheim's projected housing shortfall had turned into a surplus (RNZ). What drives the work is wine, water and trees. Marlborough carries 31,191 ha of vines, 73 percent of New Zealand's planted area (Marlborough Winegrowers).

The ground decides the job. Rapaura and Renwick sit on free-draining Wairau gravels, the Southern Valleys are hillside, and the Awatere is terraces, papa and loess. All of them need stored water in a dry year. Picton means house sites, access tracks and retaining on steep sections, and in the Marlborough Sounds the work is harvest roading, tracks and slip repair on steep country where sediment control is watched closely.

Marlborough rules that differ

  • Under the Marlborough Environment Plan, rural excavation is permitted only if it stays under 1,000 m³ on land steeper than 20 degrees in any 24 months, touches nothing over 35 degrees and keeps 8 m from rivers and stopbank toes (MEP Chapter 3).

  • Off-river dams are a permitted activity where they meet the plan's standards; larger dams may be classifiable under the Building (Dam Safety) Regulations 2022 (MDC dam safety).

  • New rural crossings must meet Marlborough Roads standards for width, surface and culvert size (Marlborough Roads).

Rules and thresholds change; we confirm the current position with your council before we quote.

Proof we bring to Marlborough

Richmond dam spillway (Tasman): spillway for a 20-million-litre irrigation dam

630 m³

Fill and topsoil

115 t

Rip-rap rock dispersal field

630 m

Geofabric filter cloth

3 weeks

Programme, including a concrete spillway with shear key and overflow pipe

These are the figures for that project, not a standard specification or timeframe for another dam.

Planned as packages

Machines floated over once, with the work programmed together.

GPS-equipped machines

Excavator and bulldozer with GPS machine control, so embankments and recontours follow the design.

Approved contractor

Approved by Fire and Emergency New Zealand and Tasman District Council.

Certified and insured

SafeTree and Tōtika certified, with $10 million public liability and $1 million statutory liability.

What clients say

Marlborough earthworks questions

Common questions from Marlborough growers, farmers and forest owners. Still unsure? Call Mitch on 021 502 429.

When does my dam become a classifiable dam in Marlborough?

When it is both 4 m or more high and stores 20,000 m³ or more. The Building (Dam Safety) Regulations 2022 took effect on 13 May 2024 and require a Potential Impact Classification from a Recognised Engineer for classifiable dams (MDC dam safety). We can tell you early which side of that line your dam is likely to sit on.

Why are forestry earthworks in the Marlborough Sounds treated so strictly?

Because sediment from erosion-prone gullies, gully-heads and steep side-slopes has been smothering estuarine and subtidal habitat, and 45 years of regulation was judged largely ineffectual. The recommended response is stricter harvest controls and replanting plans that retire those source areas (NZ Journal of Forestry). Expect close attention to roading, tracks and sediment control.

What does a dam or earthworks job cost in Marlborough?

Price depends on the volume moved, the ground (Wairau gravels dig differently from Awatere papa), truck access, any dam engineering or consent, and the float from Wakefield. We do not publish hourly rates. Phone Mitch or send photos for a ballpark; a site visit gives a fixed quote, with the scope agreed first.

Is Marlborough too far for a Nelson contractor?

No. From Wakefield the Wairau Valley is about 90 minutes, Blenheim about 120 minutes and Picton about 150 minutes via SH6 and SH63. Work further afield, such as in Marlborough, is usually planned as larger packages, so we float machines over once and programme the work together, but smaller jobs are welcome too.

Request a quote

Send the address, the water volume you need or the block to harvest, and any engineer's reports, or call Mitch on 021 502 429.

Call Mitch: 021 502 429

Email: info@aspecthub.co.nz

Aspect Contracting and Forestry, 65 Whitby Road, Wakefield

Nearby: Blenheim · Tasman District · Nelson. Our coverage also includes Rai Valley, Picton and the Marlborough Sounds. Contact Mitch with your location and the work required so we can discuss access and the programme.

This site is protected by reCAPTCHA and the Google
Privacy Policy and Terms of Service apply.

Message Sent