Skip to main content

Too much red tape, not sure where to start? Call Mitch directly at 021502429, let's make it happen together!

Forest engineering in Nelson, Tasman and Marlborough: roads, skid sites and maintenance

Forestry roads, skids, culverts and in-forest gravel, built with GPS-controlled equipment to the harvest plan and maintained through the harvest.

Forestry roading and skid sites built to the harvest plan

Aspect Contracting and Forestry provides forest engineering earthworks across Nelson, Tasman and Marlborough: new roads, skid sites, road upgrades and ongoing maintenance. Our earthworks team uses GPS-controlled equipment to build to the agreed design and harvest plan, coordinating access and landings with the harvesting subcontractors. Design responsibilities are agreed with your project team.

Forestry roading work we build

  • Spur roads of 500 m to 3 km and one or two skids for a woodlot's first harvest.

  • Road upgrades for 50MAX trucks, or re-forming roads damaged by salvage traffic.

  • Skid sites of 40 × 60 m to 40 × 80 m, road-line skids and switchbacks on steep country.

  • Culverts, cross drains and stream crossings. See drainage and culverts.

  • Small in-forest quarries and on-site crushing where hauling metal in does not stack up.

Related services: Harvest planning · Forest harvesting and woodlots · Road construction outside forestry · Gravel cartage and on-site crushing

From route plan to finished skid

1

Design from the harvest plan

Road lines, grades, landings and setbacks matched to the harvest system and truck type, with design responsibility agreed up front.

2

Notices and plans

Earthworks notices where required, plus a forestry earthworks management plan on orange and red zone land; who prepares and lodges them is agreed in the scope.

3

Form and drain

Cut to the design with GPS-equipped machines; fill benched, keyed and compacted; culverts and cross drains installed as we go.

4

Metal and finish

Rock crushed on site or carted in, spread, graded and rolled; skids finished with stable fill faces and drainage.

5

Maintain and hand back

Grading and drainage during harvest, then roads stabilised for the next rotation or farm use.

Rules for forestry earthworks

  • On orange zone land of 25° or steeper, side cuts are limited to 2 to 3 m over 100 m and 500 m³ per three months; on red land, under 2 m over 50 m and 100 m³ (MPI).

  • Keep earthworks 10 m from perennial rivers, wetlands and lakes over 0.25 ha, and 30 m from the coastal marine area (MPI).

  • In Marlborough's Rural Environment Zone, woodlot harvesting earthworks are capped at 1,000 m³ on slopes over 20° in any 24 months, with no excavation over 35° (Marlborough Environment Plan).

Rules and thresholds change; we confirm the current position with your council before we quote.

Forestry roading on our projects

Aspect is approved by Fire and Emergency New Zealand and Tasman District Council, SafeTree and Tōtika certified, and was a 2026 Top of the South Forestry Awards nominee for Roading Excellence and Innovation. Forest Growers Research award, 2024. PF Olsen award, 2023.

Forestry earthworks for wind-damage salvage, Tasman. Aspect built the extraction tracks and roads, upgraded and drained the existing roads, installed the culverts and supplied the aggregate so harvest crews could salvage wind-damaged timber before it lost value. These figures describe that project, not a standard specification or timeframe.

20,000+ lm

Extraction tracks and roads

15,000+ lm

Road upgrade and drainage

100+

Culverts

5,000+ t

Aggregate supplied

Forestry roading FAQs

Common questions from forest owners and managers. Still unsure? Call Mitch on 021 502 429.

How much does a forestry road cost per kilometre?

Terrain, rock, the number of culverts and crossings, how far metal has to be hauled and the road class drive the price. We price everything from a single skid site to kilometres of extraction road. Send us the harvest plan or a map for a ballpark; a site survey gives you a fixed quote.

How wide and how steep can a forestry road be?

A spur road serving one or two skids is 4 to 4.5 m wide, a secondary road 6 to 8 m and an arterial 8 to 9 m (NZFOA Road Engineering Manual). The Approved Code of Practice caps log cartage roads at 20% (11°), and the Manual recommends 12.5% adverse loaded for 50MAX trucks (NZFOA).

How big does a skid site need to be?

New Zealand landings average about 3,900 m², with company specifications commonly 40 × 60 m or 40 × 80 m (Canterbury landing study). Size is driven by the number of log sorts and daily production, so fewer sorts mean a smaller, cheaper skid. We size each skid to the harvest plan.

Do I need consent for forestry earthworks in Tasman?

Mostly no, if you stay within permitted limits and notify. Forestry earthworks are permitted in green and yellow zones and on orange land under 25°; steeper orange and red land has cut and volume limits, and exceeding them needs consent (MPI). Tasman District Council asks for management plans within five working days of your notice (MPI Ground Rules).

Can you quarry gravel on my own block for the roads?

Yes, within the NES-CF limits. Extraction over 200 m³ a year needs notice to the council and a quarry erosion and sediment management plan 20 working days before starting. New quarries must be 500 m from dwellings in other ownership (NES-CF Regulations 2017). We crush and screen on site where the rock suits.

How long does it take to build forestry roads and skids?

Council notice comes first: 20 to 60 working days for earthworks over 500 m² in orange and red zones (MPI). Construction time depends on length, rock and weather, and we give you a programme with the quote. We build in the dry where we can, so roads settle before harvest.

Do you build forestry roads in Marlborough and Golden Bay?

Yes. From Wakefield we build forestry roads across Nelson, Tasman, Golden Bay and Marlborough, including the Sounds, St Arnaud and Murchison, and quote the same way wherever the block is. Marlborough work follows the Marlborough Environment Plan's slope and volume limits as well as the NES-CF (Marlborough Environment Plan).

What clients say

Request a quote

Send us the harvest plan or a map of the block for a price on roads and skids. We work across Nelson, Tasman and Marlborough, including Golden Bay/Tākaka, St Arnaud, Murchison, Blenheim, Picton and the Marlborough Sounds.

Call Mitch: 021 502 429

Email: info@aspecthub.co.nz

Aspect Contracting and Forestry, 65 Whitby Road, Wakefield

Emergency enquiries: call Mitch at any time; routine enquiries answered within 48 hours.

This site is protected by reCAPTCHA and the Google
Privacy Policy and Terms of Service apply.

Message Sent