Our projects in earthworks and forestry across Nelson, Tasman and Marlborough

Four real jobs, with the figures as we recorded them.

Earthworks and forestry projects in Tasman

Aspect Contracting and Forestry works on subdivisions, dams, house sites, driveways and forest roads across Nelson, Tasman and Marlborough. These four projects range from a 14-lot subdivision to the roading that got wind-damaged timber out of a Tasman forest. The figures are project figures, not a standard specification or a capacity limit.

Four projects, with the figures

Ruby Bay Views subdivision, Tasman

Bulk earthworks for a 14-lot residential subdivision at Ruby Bay, built to the engineer's design with GPS machine control.

14 lots

Residential subdivision.

40,000 m³

Around 40,000 m³ of cut-to-fill and topsoil.

GPS

High-precision GPS machine control.

5 months

About five months on site.

Subdivision earthworks · GPS earthworks

Spillway for a 20-million-litre dam, Richmond

A new spillway for a 20-million-litre dam, built to carry overflow safely past the embankment.

630 m³

Fill and topsoil.

115 t

Rip-rap rock dispersal field.

630 m

Geofabric.

35 m

Retaining wall, plus a 20 m concrete block wall.

3 weeks

Including a concrete spillway with shear key and overflow pipe.

Fire ponds, dams and spillways · Retaining walls

Driveway and house site, Tasman

Clearing a pine-covered rural block, forming the driveway and cutting the house site so the owners could build.

4,500 m³

Cut-to-fill.

100+

Pine trees removed.

3

Culvert crossings on the driveway.

Driveways and farm tracks · Site preparation · Land clearing

Forestry earthworks for wind-damage salvage, Tasman

Roads, extraction tracks, drainage and aggregate supply so harvest crews could salvage wind-damaged timber before it lost value.

20,000+ lm

Extraction tracks and roads.

15,000+ lm

Road upgrade and drainage.

100+

Culverts installed.

5,000+ t

Aggregate supplied.

Forestry roading · Harvesting · Gravel cartage and crushing

What clients say

"Mitch and his team have done an amazing job constructing a substantial spillway and drainage system for our large irrigation dam. Aspect has very successfully fulfilled all of our requirements for the project with very little disruption to the business we run from our property. It has been a pleasure to have such considerate and skilled team on site for the past 2.5 weeks. Mitch's communication skills were excellent and he always kept us up to date on timelines for sub-contractors and sorted out any problems that came up, which took the pressure off us."
Niki & Rob Marshall, Google review

"Aspect completed significant post-harvest infrastructure works in our forest, and in addition undertook some detailed works to expand and develop a new events venue. This was work without a defined brief and under time pressure, which Mitch and the Aspect team handled professionally and the resulting work exceeded our expectations. Great communications and management systems used, we would highly recommend Aspect for any earthworks or infrastructure projects."
Matt Griffin, Google review

Request a quote

Have a job like one of these? Send us the details and Mitch will get back to you.

Call Mitch: 021 502 429

Email: info@aspecthub.co.nz

Aspect Contracting and Forestry, 65 Whitby Road, Wakefield

Emergency enquiries: call Mitch at any time; routine enquiries answered within 48 hours.

This site is protected by reCAPTCHA and the Google
Privacy Policy and Terms of Service apply.

Message Sent